Come see us at the Columbus Building & Renovation Expo!

January 2–4, 2026 | Ohio Expo Center, Kasich Hall
January 2–4, 2026
Ohio Expo Center, Kasich Hall

Bathroom Remodel in Powell, Ohio

A full remodel of the second-floor guest bathroom, from a new shower pan and walls to finished lighting and fixtures.

Scope

2nd floor guest bathroom remodel

Shower & Flooring

New pan, walls & pivot door
New LVP

2nd Floor Guest Bath Remodel

The second-floor guest bathroom was rebuilt around a new shower and vanity, with new flooring, lighting, plumbing fixtures, and a full repaint.

Before
  • Installed a new shower pan and shower walls
  • Installed a new pivot shower door
  • Installed a new shower valve and trim
  • Installed a new vanity
  • Installed a new vanity top
  • Installed a new vanity faucet
  • Installed new vanity lights
  • Installed new LED ceiling lights
  • Installed new LVP flooring
  • Painted the entire bathroom
After
Item
Product / Spec
Shower
New shower pan and walls
Shower door
New pivot shower door
Shower plumbing
New shower valve and trim
Vanity
New vanity with new vanity top
Vanity faucet
New faucet
Vanity lighting
New vanity light fixture
Ceiling lighting
New LED ceiling lights
Flooring
New LVP flooring
Paint
Full bathroom repaint

About This Project

What was included in the guest bathroom remodel in Powell, Ohio?

The second-floor guest bathroom remodel included a new shower pan and shower walls, a new pivot shower door, a new shower valve and trim, a new vanity with a new vanity top, a new vanity faucet, new vanity lighting, new LED ceiling lights, new LVP flooring, and a full repaint of the bathroom.

What shower work was done in this bathroom remodel?

The shower was rebuilt with a new shower pan and new shower walls, a new frameless pivot shower door, and a new shower valve and trim for the plumbing fixtures.

What fixture finish was used throughout the Turrill renovation?

The shower was rebuilt with a new shower pan and new shower walls, a new frameless pivot shower door, and a new shower valve and trim for the plumbing fixtures.

What vanity updates were made?

The bathroom received a new vanity with a new vanity top, along with a new vanity faucet and new vanity lighting above the mirror.

What flooring and lighting were installed?

The bathroom was finished with new LVP flooring and new LED ceiling lights, in addition to the new vanity lighting.

Was the bathroom repainted?

Yes — the entire bathroom was painted as part of the remodel.

Project: Residence, Powell, Ohio. Scope: full guest bathroom remodel.

Call or Text Wingler Construction & Remodeling

Call Us
Call Us
Text Us
Text Us
Reviews
Read Reviews
Quote
Request Quote
Message
Message Us
Email
Email Us
Directions
Get Directions
Share
Share Us